BS ISO 7870-3:2020 pdf download – Control charts Part 3: Acceptance control charts The acceptance control chart is a useful tool for covering this wide range of approaches in a logical and simple manner. It distinguishes between the inherent variability components randomly occurring throughout the process and the additional location factors which contribute at less frequent intervals. When shifts appear, the process may then stabilize at a new level until the next such event occurs. Between such disturbances, the process runs in control with respect to inherent variability. An illustration of this situation is a process using large uniform batches of raw material. The within- batch variability could be considered to be the inherent variability. When a new batch of material is introduced, its deviation from the target may differ from that of the previous batch. The between-batch variation component enters the system at discrete intervals. An example of this within- and between-batch variation can very well occur in a situation where a blanking die is blanking a machine part. The purpose of the chart is to determine when the die has worn to a point where it must be repaired or reworked. The rate of wear is dependent upon the hardness of the successive batches of material and is therefore not readily predictable. It will be seen that the use of an acceptance control chart makes it possible to judge the appropriate time to service the blanking die. The acceptance control chart is based on the Shewhart control chart (i.e. X – R chart or X – s chart) but is set up so that the process mean can shift outside of control limits of the Shewhart control chart if the specifications are sufficiently wide, or be confined to narrower limits if the inherent variability of the process is comparatively large or a large fraction of the total tolerance spread. What is required is protection against a process that has shifted so far from the target value that it will yield some predetermined undesirable percentage of items falling outside the specification limits, or exhibits an excessive degree of process level shift. When a chart of the average value of data sets from a process is plotted, in sequence of the production, one notices a continual variation in average values. In a central zone (acceptable process, Figure 1), there is a product that is indisputably acceptable. Data in the outer...

Download Address

  • Download